dhahn@hahn-eng.com

+845.279.2220

Design, engineering report, WCDOH Permit, public bid, construction inspection of 250,000 gallon pre-stressed reinforced concrete potable water storage tank, with a precast valve chamber and 900 feet of 12 inch water main through a rock slope.